We are now around a quarter of the way from Turkey to
Gibraltar and an eighth of the way to the Caribbean. Yes Zerrin, there is now a
serious hole in that elephant – I think maybe his tail and one leg are gone. After
initial problems, due as is often the case to not doing a shakedown cruise
before setting off, Petronella is in reasonable shape. The water pump seems to
be fixed and then stern gland is behaving itself better for some unknown
reason! We’ve had to buy a shiny new 21m long mainsheet (rope) as the
replacement blocks (pulleys) we bought when we were back in England were too
small for the old rope despite being advertised as adequate. What else has gone
wrong? Oh yes, the Pactor modem which worked fine in Turkey no longer works
here in Greece so there is work to do there before we hit the Atlantic as this
will provide our contact with Emma (The Wombat), our shore support lead. Also
giving problems are the direction indicator on the anemometer at the top of the
mast and the chain stripper which makes sure the anchor chain runs smoothly
back into its locker when we pull it up. At present it doesn’t and is proving
hard to fix.
Things that are working well are the new AIS, the solar
panels,…. No, I’ll stop there because you can guarantee that if I say it is
working well today then tomorrow it will break.
We are OK too now we’ve have had a few days rest here in the
Ionian. We have a few more days in these lovely bays before Jen and Marcus fly
out to Kefalonia on Saturday. We’ll give them a day to recover and watch the
World Cup final before we set off with them for Sardinia via Sicily. This will
be a trial run for the Atlantic crossing so we are hoping we all get on with
each other!!
No comments:
Post a Comment